Business Garden Warszawa, Stage 2, Warszawa, Poland

  • Tipo de Edificio:
  • Edificios de Oficinas
Pantalla completa Cerrar Street View

Five buildings were built in the second stage of the investment. 

The buildings were designed in a mixed structure: the underground part as a monolithic structure, and the above-ground part in a prefabricated structure.

In total, over 1960 m of DELTABEAM® beams and hidden PCs® Corbels were built into the project. The buildings meet the highest LEED certification standards.

Leer más down-arrow.png

Datos del proyecto

Tamaño del poyecto:
102,000 m2
Pavimentos:
2+7
Inversor:
Vastint Poland
Empresa Constructora:
Hochtief Polska
Ingeniería, Calculista:
Arcade Polska
Arquitecto:
JSK Architekci
Prefabricador:
Ergon Poland
Año de construcción:
2014
Año de finalización:
2017

Habla con expertos