Community Facility of Jamsil Jinju Apartment, Songpa-gu, Seoul, South Korea

  • Tipo de Edificio:
  • Centros Comerciales
Pantalla completa Cerrar

This project applied a dry joint system to the stair core of the community facility within the apartment complex.

The construction-stage analysis was divided into three phases: after core element installation and before grout curing, after grout curing, and finally the stage where the core interacts with the main structural system. The construction was completed quickly and safely.

Datos del proyecto

Inversor:
Samsung C&T Corporation
Empresa Constructora:
Samsung C&T Corporation
Ingeniería, Calculista:
RISE STRUCTURAL ENGINEERING
Arquitecto:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
Prefabricador:
KC INDUSTRY
Año de construcción:
2023
Año de finalización:
2023

Habla con expertos