Kromberg & Schubert Manufacturing Plant Extension, Slovakia

  • Tipo de Edificio:
  • Edificios Industriales
Pantalla completa Cerrar Street View

This is an extension to an existing manufacturing plant for cable harness. The extension was connected to the existing production hall with which it was also connected in terms of communication. New office and training spaces were created.

As part of the new extension, the sanitary facilities for production workers in the production halls were also expanded and a new server room was built.

The building was designed so, that it could be extended by one additional floor if necessary.

DELTABEAM® Composite Beams were used in the slab structures to reduce the height of the floors. Bolted connections were used to connect the columns to columns, and columns to foundation. Also hidden corbels were used to connect the prefabricated beams to the columns so that this joint is not visible.

Leer más down-arrow.png

Datos del proyecto

Tamaño del poyecto:
1771 m2
Pavimentos:
2
Inversor:
Kromberg & Schubert
Empresa Constructora:
IN VEST s.r.o.
Ingeniería, Calculista:
Ing. Marián Petráš
Arquitecto:
Akad. Arch. Jozef Mravec
Prefabricador:
IN VEST s.r.o.
Año de construcción:
2024
Año de finalización:
2024

Habla con expertos

Mihálek Gabriel Ing.

Mihálek Gabriel Ing.

Manažér predaja Slovensko

Mob. 00421/911 260 499
[email protected]