Montessori Education Campus, Netherlands

  • Tipo de Edificio:
  • Educación y Cultura
  • Estadios
Pantalla completa Cerrar Street View

A Smart Campus for Every Age: From Nursery to Secondary School.

We were approached by BINX Smartility, a company then unfamiliar to us, based in Groenlo. They were participating in a Design & Build tender for a new educational campus designed to support children from ages 0 to 18. 

The campus would feature multiple teaching levels, a nursery, a library, and a large auditorium with a stage. A full-sized sports hall would sit alongside the main building, creating a complete and future-ready learning environment.

BINX asked us to collaborate on the structural design, specifically focusing on the main load-bearing system. In our initial meeting, we reviewed the scope of the project and identified the key needs of all stakeholders involved. This led to a clear set of structural priorities:

  • Slim floor systems
  • Flexible and open interior spaces
  • Simple detailing for faster execution
  • Dry construction methods with no need for props or bracing
  • Integrated fire resistance
  • Efficient planning and delivery of a turnkey solution

With various stakeholders involved, each with their own expectations, the solution had to balance speed, simplicity, and high performance. BINX was looking for a structural approach that could streamline construction while maintaining quality.

Through multiple engineering sessions with BINX and Adviesburo Wiggers, we developed a design based on the DELTABEAM® Composite Beam combined with the HPKM® Column Shoe. This structural system met all project requirements, offering speed, precision, and long-term value.

 

This integrated solution became a core part of BINX’s successful proposal. We’re proud to have contributed to such an innovative and forward-thinking educational project.

 

Leer más down-arrow.png

Datos del proyecto

Tamaño del poyecto:
8000 m2
Pavimentos:
3
Inversor:
Binx Smartility
Empresa Constructora:
Binx Smartility
Ingeniería, Calculista:
Adviesburo Wiggers
Arquitecto:
Roos Ros Architecten
Prefabricador:
Holcon
Año de construcción:
2023
Año de finalización:
2024

Habla con expertos