Water treatment plant, Eindhoven, Netherlands

  • Tipo de Edificio:
  • Edificios Industriales
  • Insfraestructuras
Pantalla completa Cerrar Street View

For the raising of the sedimentation basin within the sewage treatment plant in Eindhoven, the precast elements are connected to each other in a fast and efficient way with the Peikko SUMO® wall shoe connection. 

This dry connection consists of a SUMO® Wall shoe cast in one element and an HPM® anchor bolt cast in the other element. Together this forms the wall shoe joint that absorbs tensile loads. To provide protection against corrosion, the connections are galvanized in this project.

Datos del proyecto

Inversor:
Waterschap De Dommel
Empresa Constructora:
Van Boekel Bouw & Infra
Prefabricador:
Haitsma Beton
Año de construcción:
2019
Año de finalización:
2020